Pictures of The Frame re-build

 

 

The re build finally starts.

  HOME ::
 
 
The Frame !
1   2   3  

4

 
5   6   7   8
 
9   10   11   12
 
13   14   15   16
 
17   18   19   20
 

 

1. No lift yet so a nice new wooden bench.

 

2, First job on with the center stand.

 

3.and 4. New Pin, Bushes and spring.

 

5. New split pin.

 

6. New rubber stop.

 

7. Now for the front gaurg and forks pre assembled.

 

8. New steering race bearings.

 

9. Tighten color nuts.

 

10.Starting to take shape.

 

11.New Engine stop rubber fitted.

 

12.Engine in.

 

13. Torque engine bolt.

 

14. On with the simple wiring loom.

 

15. The rear Toruqe link (seperate set of pics)

 

16. Fit rear mudgaurd.

 

17. New side pannel rubbers.

 

18. Fit front hub.

 

19. On with the front wheel.

 

20. On with the rear wheel.